Swan Park – Nhon Trach District
Owner : CFLD International
Package : Structure, MEP, Facade Finishing (101 single villas)
Duration : 12 months (Construction on 11/2019)
Location : Nhon Trach District, Dong Nai Province
Area : 200.000 m2
Owner : CFLD International
Package : Structure, MEP, Facade Finishing (101 single villas)
Duration : 12 months (Construction on 11/2019)
Location : Nhon Trach District, Dong Nai Province
Area : 200.000 m2