We understand our clients want to see results that make a difference and more.

As a general contractor, we understand that a suitable construction plan for each project depends on the detailed preparation stage, in which the requirements for quality, schedule, cost, risks, constraints are met. obligations and interests of the parties involved…

Solutions succeed with projects through effective planning from the right team and tight controls that are maintained continuously over the life of the project to ensure challenges are addressed. effectively, meet the goals of time, cost, quality of the project, and reduce risks for the investor.

Design & Build contractor (D&B), we are responsible for delivering important results for our clients, from initial design concept to project completion through:

Project management: through effective planning, the right team, and tight control measures reduce project risk and reduce construction schedule.

Supply Management: develop a network of suppliers, subcontractors, teams to create a strategy to provide a “construction & material team” to get the best cost from the market.

Control Management:  proactive controls from a clear bring about optimization of building design, materials, methods, techniques, etc… The construction process is faster, flexible, ensuring high performance and aesthetics.

If a design-build contract model is right for you, then you can expect Solutions create a partnership to make the whole construction project go smoothly.

With construction experience and understanding of the operation of each separate M&E system in all fields of infrastructure, civil, commercial, and industrial.., We always propose the most suitable systems for the scale of the customer’s project, optimizing to meet the high standards of technique, quality, and progress in order to bring benefits to the investor:

  1. Facilitate in optimizing the construction process, shorten the construction duration.
  2. Clear responsibility in liaising and managing MEP systems to ensure best possible quality.
  3. Cost saving: reduce indirect cost of the contractor, reduce co-ordination cost of management team of the Owner, increase opportunity cost due to shorten construction time.